Yes. Our factory history can be dated back to 1999.
One year generally.
Generally, wire mesh welding machine can be finished around 45-60 days. Small machines like chain link fence machine needs around 30 days.
T/T and L/C generally.
30% by T/T in advance, 70% by T/T before load container.
Sure. Machine voltage can be designed as different industrial voltages for different countries, like 3Phase 220V 60HZ , 3Phase 380V 50HZ, 3Phase 440V 50HZ, etc.
Yes, our engineers are fully capable of troubleshooting and repairing machines.
Generally, our machines is shipped by sea.
Generally, we quoted based on shipping terms FOB Port, China.
Shipping cost is not stable. We honestly advise you to confirm what machine do you need and double check before machine load container.
Yes. We can send our engineers to your factory for machine installation and operators training.
Yes. We have one-stop service and provide the whole production line. You can produce final products directly.
Of course. For example, wire mesh welding machine is designed for different wire diameter, mesh size, mesh width. Importantly the product of welded wire mesh can be applied in precast reinforcing, welded fence, industrial mesh like wire tray, etc.
Certainly. After machine finished, the machine instruction and electrical scheme will be updated and then sent to you before machine discharged in your factory. In this way, you can know more details about machines.
Yes. After machine is assembled, engineers will debug and run machines to ensure it working well.
No problem. we share you technical passport and provide technical support for our machines. Our engineers support can be with you all the time.
If technicians helped to commission machine, it usually takes around 7-15days.
It charges some cost if technicians commission machines in your factory.
Nowadays, most machines is controlled by HMI and PLC precisely and automatically. Therefore, it ensures high production, smooth running and decreases labor cost much.
We will send you layout drawing of machines after order confirmed for your reference.
Since 1999 establishment, our machines was sold to more than 150 countries and regions.
Yes. Based on smooth integration of electrical system, the electrical appliance brands can be famous brands with higher machine price.
Yes. Engineers can help you online for fast trouble shooting.
Yes. We can paint the machine with request color code.
The machine lifespan is designed for at least 10 years.
Yes, please inquire for a specific quote based on your purchase volume.
Usually 30 days.
Of course.
Production is generally scheduled within 1-2 days after an order is confirmed.
Yes. If the customer requests it, the factory can provide bi-weekly feedback on production progress.
It will definitely incur a significant fee and extend delivery time. Therefore, it is not recommended to modify the order after production has been scheduled.
Yes. We provide a long-term supply of consumable parts to ensure the normal operation of the machine.
Before packing, wrap the equipment with plastic film to prevent moisture. Secure the machine with wire or steel rope during packing.
Yes.
Depending on the shipping terms, under FOB and CFR terms, the buyer purchases insurance, while under CIF terms, the seller purchases insurance.
Yes, we will arrange shipment according to normal shipping standards.
Yes. After receiving the ocean bill of lading, we will promptly send tracking information so that the customer can stay informed of the shipment’s progress.
Yes. Before the machine arrives at the destination port, we will send complete customs clearance documents to ensure smooth import customs clearance.
The machine is simple to operate and can be operated skillfully by most workers with training.
Customization is possible. Please provide detailed requirements for wire diameter, mesh size, mesh width, and other parameters, and our technicians will review them.
The noise level during operation is low, meeting standard requirements. We can also provide labor protection noise-reducing earmuffs upon request.
Energy consumption varies depending on the machine. The motor power of the barbed wire machine is very low, with an average unit power consumption of 1 kilowatt-hour.
Most machines are generally made of low-carbon iron wire; wire drawing machines can use high-carbon iron wire.
Yes, for example, mesh welding machines have fault alarm functions and a high degree of automation.
The customer needs to prepare the site, industrial power, three-phase four-wire cables, raw materials required for production, dedicated and long-term workers, and the hardware tools commonly used for equipment installation and operation.
Yes. The training covers daily equipment maintenance, equipment operation, and troubleshooting. If the workers are diligent, the training typically lasts 7-10 days.
Yes. A basic training fee will be charged depending on the situation.
We can quickly resolve the problem through online technical support.
Yes. The maintenance manual will be provided to the customer before the customer receives the machine.
Yes. Long-term partners can receive more favorable pricing, more comprehensive technical support, and more timely market advice.
Delivery times will be as agreed in the contract, and we can guarantee on-time delivery during peak season.